Order backlog
Order backlog by country and segment as at 31 December 2024
€ mn | Total 2024 | North + West | South + East | Inter-national + Special Divisions | Other | Total 2023 | Δ Total % | Δ Total absolute |
Germany | 13,653 | 11,596 | 384 | 1,649 | 24 | 12,544 | 9 | 1,109 |
Austria | 2,565 | 38 | 2,036 | 488 | 3 | 2,360 | 9 | 205 |
Poland | 2,235 | 1 | 1,902 | 332 | 0 | 1,944 | 15 | 291 |
United Kingdom | 1,259 | 4 | 3 | 1,252 | 0 | 1,794 | -30 | -535 |
Czech Republic | 1,030 | 2 | 1,014 | 10 | 4 | 939 | 10 | 91 |
Americas | 695 | 0 | 0 | 695 | 0 | 614 | 13 | 81 |
Romania | 653 | 21 | 599 | 33 | 0 | 496 | 32 | 157 |
Middle East | 479 | 0 | 24 | 455 | 0 | 462 | 4 | 17 |
Croatia | 450 | 0 | 440 | 10 | 0 | 323 | 39 | 127 |
Slovakia | 425 | 0 | 418 | 7 | 0 | 232 | 83 | 193 |
Hungary | 417 | 0 | 416 | 1 | 0 | 348 | 20 | 69 |
Italy | 411 | 0 | 11 | 400 | 0 | 459 | -10 | -48 |
Benelux | 213 | 180 | 1 | 32 | 0 | 158 | 35 | 55 |
Slovenia | 204 | 0 | 199 | 5 | 0 | 59 | > 100 | 145 |
Rest of Europe | 133 | 0 | 125 | 8 | 0 | 192 | -31 | -59 |
Switzerland | 130 | 124 | 4 | 2 | 0 | 111 | 17 | 19 |
Sweden | 129 | 98 | 31 | 0 | 0 | 108 | 19 | 21 |
Asia | 125 | 0 | 3 | 122 | 0 | 175 | -29 | -50 |
Serbia | 66 | 0 | 66 | 0 | 0 | 49 | 35 | 17 |
Bulgaria | 39 | 0 | 39 | 0 | 0 | 17 | > 100 | 22 |
Africa | 27 | 0 | 23 | 4 | 0 | 53 | -49 | -26 |
Denmark | 24 | 24 | 0 | 0 | 0 | 29 | -17 | -5 |
Total | 25,362 | 12,088 | 7,738 | 5,505 | 31 | 23,466 | 8 | 1,896 |
€25.4billion
Order backlog
After exceeding the € 25 billion mark for the first time in the first half of the year, the order backlog was increased further to € 25,362.47 million by the end of 2024, which corresponds to an increase of € 1.9 billion or 8% compared to the previous year. The order backlog in Germany rose particularly sharply, especially in infrastructure and civil engineering. Significant increases were also recorded in Poland, Austria, Slovakia and Romania. Encouragingly, the first signs of a turnaround in residential construction in Austria were confirmed in the fourth quarter of 2024. In the United Kingdom, the order backlog has been on the decline as major projects are being worked off.
Development of order backlog
The most significant additions to the order backlog in Germany include network expansion projects for the energy transition worth more than € 1.1 billion, the general overhaul of the Hamburg–Berlin railway line and the replacement of the Kriegenbrunn shipping lock in Bavaria. In Slovakia, STRABAG was awarded the contract for the conversion and expansion of the F.D. Roosevelt Clinic, and in the Czech Republic for the construction of the new headquarters of the local subsidiary of Erste Group, which will be realised to the highest sustainability standards. Internationally, contracts were acquired for a rapid transit line in Toronto and for the construction of a residential district in Abu Dhabi, among other things.
Construction sites included in the order backlog as at 31 December 2024
Category | Number of construction sites | Number of construction sites as % of total | Order backlog € mn | Order backlog as % of total |
Very small orders (€ 0–1 mn) | 10,786 | 79 | 2,267 | 9 |
Small orders (€ 1–15 mn) | 2,215 | 16 | 3,838 | 15 |
Medium-sized orders (€ 15–70 mn) | 373 | 3 | 6,116 | 24 |
Large orders (€ 70–150 mn) | 64 | 1 | 3,225 | 13 |
Very large orders (>€ 150 mn) | 57 | 1 | 9,916 | 39 |
Total | 13,495 | 100 | 25,362 | 100 |
The total order backlog is comprised of 13,495 individual projects. Approximately 13,000 of these, or 95%, involve very small or small orders with a volume of up to € 15 million each; the remaining proportion of 5% covers medium-sized to very large orders with contract volumes of € 15 million and up. A total of merely 57 projects have a volume above € 150 million. The high number of individual contracts guarantees that the risk involved with one project does not, as far as possible, threaten the Group success as a whole. The ten largest projects in the order backlog as at 31 December 2024 added up to 17% of the order backlog.
Selected large projects in the order backlog as at 31 December 2024
Country | Project | Order backlog € mn | As % of total Group order backlog |
United Kingdom | HS2 high-speed rail line | 961 | 3.8 |
Germany | Bayerische Versorgungskammer | 543 | 2.1 |
Germany | U5 East, Hamburg | 521 | 2.1 |
Germany | US hospital, Weilerbach | 520 | 2.1 |
Germany | Lock Kriegenbrunn | 356 | 1.4 |
Germany | Central Business Tower | 351 | 1.4 |
United Arab Emirates | Residential towers, Sea La Vie | 292 | 1.2 |
United Kingdom | Woodsmith Project | 282 | 1.1 |
Germany | Replacement building, Ruhr University Bochum | 271 | 1.1 |
Canada | Scarborough Subway Extension Line 2 | 251 | 1.0 |
Total | 4,348 | 17.3 |